Current Build Time / Aktuelle Bauzeit

What / Was Hours / Stunden
Unboxing and cleaning
Auspacken und bereinigen
0,5
Hollowing of the Buildings and the Ship Body
Fräsen der Aufbauten und des Schiff Rumpfes
15
Drilling holes for Fiber Optics
Löcher für LWLs bohren
4,5
Repair and Putty works
Reparaturen mit Putty und co.
1
Installing Fiber Optics
Lichtwellenleiter verlegen
25
Total / Gesamt 45